Skip to content
Clear River Contracting
Walk-in shower with white subway tile, a matte black rain shower fixture and a built-in niche, in the alcove where a Chapel Hill tub used to be

Chapel Hill · Carrboro · Durham

Tub-to-Shower Conversions in Chapel Hill, Carrboro and Durham

The tub nobody uses comes out and a walk-in tiled shower goes in the same footprint. Priced with the three shower packages, from $14,000.

15 five-star reviews on Google · BBB Accredited, A+ · Fully insured

Get a price range

A few photos of the room is enough for a first number. We reply within 24 hours, Monday through Friday.

Up to 5 photos. Phone pictures are fine; they get shrunk before sending.

Or call or text (208) 481-2298.

  • A reply within 24 hours, Monday through Friday
  • A price range, not a sales call
  • No site visit needed for a first number

“He listened to what we wanted and left us with a beautiful bathroom that matched our wishes for it.”Robin Baird · Google review

Illustration: a tub-shower combo is torn out, a waterproof pan and membrane go in, tile climbs the walls, then glass and fixtures finish it.

Step by step

How a tub-to-shower conversion goes

  1. The old tub

    A tub-shower combo nobody uses as a tub, with tile that has seen better days.

  2. Tear-out and pan

    Everything comes out to the studs. A Schluter pan and membrane make the alcove waterproof before any tile goes on.

  3. Tile goes up

    Walls tiled floor to ceiling with a niche, usually in 3 to 4 days.

  4. Glass and fixtures

    Glass is measured after the tile is set and installed 1.5 to 2 weeks later. Delta valve and trim.

Most tubs in Chapel Hill and Durham homes are a place to stand while you shower. A tub-to-shower conversion takes the tub out and puts a walk-in tiled shower in the same alcove. The footprint stays, the plumbing usually stays, and the room works the way you use it.

What happens to the tub

The tub, the surround and whatever is behind them come out completely. We go back to the framing, check the subfloor, and build the new shower on a Schluter system: a foam pan and a bonded membrane under every tile, so water never reaches the wood. Then the tile goes on, with a niche or two, and the valve and trim. The glass is measured after the tile is finished and installed about 1.5 to 2 weeks later, so it fits exactly.

What it costs

A conversion is priced with the same three packages as any other shower: the Refresh at $14,000, the Signature at $16,000 and the Luxe Spa at $18,000. The one extra is plumbing work if the drain has to move, and that is in your quote before we start. The number does not move unless you change the scope.

How long it takes

Tile is done in 3 to 4 days. The glass follows about 1.5 to 2 weeks later. If you want the vanity, floor and paint done at the same time, that becomes a full bathroom remodel, and most of those land between $20,000 and $35,000.

If it is the only tub in the house

Buyers with small children want one tub somewhere in the house. If you have a second bathroom with a tub, converting the one you shower in is an easy call. If this is the only one, weigh that first. Our post on whether a tub-to-shower conversion is worth it goes through the resale side.

Service area: Chapel Hill, Carrboro, Durham, Hillsborough and Pittsboro.

Before and after

A Chapel Hill conversion

A tub-shower combo with square tile and a curtain. It came out, and a walk-in shower with white subway tile, a recessed niche and a matte black rain head went into the same alcove.

The rest of the room was done at the same time: a new vanity with a quartz top, lighting, a pivot mirror and a hex tile floor.

See the whole Heritage project

Old tub-shower combo with white square tile and a curtain, and the walk-in tiled shower that replaced itAfter

Heritage Modern Luxe, Chapel Hill. Drag to compare.

Packages

Three packages, one price each

Every package is a real tile shower on a Schluter waterproofing system. The difference is the tile selection and the extras. Most people pick The Signature.

Mosaic tile shower floor and gray porcelain walls behind a glass half wall

The Refresh

$14,000

The straightforward one. A real tile shower with clean, simple materials.

  • Full demo and haul-away
  • Site protection and daily cleanup
  • Schluter waterproofing system
  • Tile from the basic selection
  • 1 niche or corner shelf
  • Valve and trim
  • Epoxy grout
  • Clear glass door, measured after the tile is set (slider available for a little more)
  • Tile done in 3 to 4 days
  • 1-year craftsmanship warranty
Start with the Refresh
Delta chrome rain shower head, valve and handheld wand on gray porcelain tile

The Luxe Spa

$18,000

Premium tile, a bench, a lit niche, soundproofing, a full accent wall and a frameless enclosure.

  • Full demo and haul-away
  • Site protection and daily cleanup
  • Schluter waterproofing system
  • Tile from the premium selection
  • 2 niches or one oversized niche
  • LED niche lighting
  • Corner bench
  • 2 shower fixtures
  • Soundproof insulation
  • Full accent wall
  • Valve and trim
  • Epoxy grout
  • Frameless glass enclosure, measured after the tile is set
  • Tile done in 3 to 4 days
  • 1-year craftsmanship warranty
Start with the Luxe Spa

Process

How it works

  1. Send us photos

    A few phone pictures of the room and a note on what you want. We reply within 24 hours, Monday through Friday, with a price range. No site visit needed for a first number.

  2. Pick a package

    Refresh, Signature or Luxe Spa. We go over tile, fixtures and layout and you get one number for the whole job.

  3. We build it

    Shawn runs the job, with the same tile, plumbing and glass subs we have used for years. Showers are tiled in 3 to 4 days. Full bathrooms get a schedule before we start.

From real jobs

How a shower goes in

The same four stages on every shower, tub-to-shower conversions included.

  1. Old tub-shower combo with white square tile and dated fixtures before the remodel

    Step 1: The old tub

    A tub-shower combo nobody uses as a tub, with tile that has seen better days.

  2. Durham shower alcove before tile, with waterproof backer board and a Schluter pan

    Step 2: Waterproof first

    Everything comes out. A Schluter pan and backer make the alcove waterproof before any tile goes on.

  3. Mosaic tile shower floor with a square drain beside the glass half wall

    Step 3: Tile and drain

    Floor and walls tiled, niche built in, usually 3 to 4 days.

  4. Rain shower head and handheld wand next to the frameless glass panel hinge

    Step 4: Glass and fixtures

    Glass is measured after the tile is set and installed 1.5 to 2 weeks later. Delta valve and trim.

Reviews

What shower clients say

See all 15 reviews on Google
Google review

Shawn was great to work with! We were happy with the bathroom he worked with us to renovate and appreciated his guidance along the way. He listened to what we wanted and left us with a beautiful bathroom that matched our wishes for it. He was very communicative along the way, which was a major help to the process.

Robin Baird

Google review

I highly recommend Clear River Contracting. Originally I hired Shawn to replace an old fiberglass moulded shower with a new unit, which he did and it looks amazing! He went over and above with every detail.

I was in the process of getting my home of 33 years ready to go on the market and I was overwhelmed with repairs/upgrading that needed to be completed. Shawn took on everything that I threw in his direction without hesitation, which included a new bathroom, carpentry work on my deck/house exterior, drywall, plumbing, electrical, power washing house/driveway, painting - there is no way I could have met my deadline without his help.

I am so thankful he answered my plea for help on Nextdoor!

Linda Jacob

Google review

We were so impressed with Shawn with Clear River Contracting. We had started our project with another individual who had overstated their abilities, did not show up, and left us with an attic that was worse off than we started. Shawn came in and was able to not only complete the job, but fix many of the glaring mistakes from the prior contractor and left us with a beautiful and functional space. Shawn has a very clear attention to detail, bordering on perfectionism. Possibly even more important, Shawn always showed up when he said he would, his pricing was transparent (excel spreadsheet with each line item priced out) and didn’t suddenly change for no reason, and full of integrity. By the end of the project we not only had found a go-to contractor, but a friend. We’re so glad we found Clear River Contracting.

Rachel Breuhaus

Accredited and partnered with

  • BBB Accredited Business, A+ rating, accredited since December 2022
  • Member of The Chamber of Commerce
  • Finch Lumber Co., supplier partner
  • Wisetack, financing partner

FAQ

Common questions

What’s the typical timeline for a shower remodel?

Most showers are tiled in 3 to 4 days. The glass is measured after the tile is finished and installed about 1.5 to 2 weeks later. Full bathrooms vary with the scope, whether the work is permitted and whether glass is part of the job. You get a schedule before we start. How long a remodel takes walks through the stages.

Will my old shower be removed during the remodel?

Yes. The old shower or tub surround comes out completely on every job, so the waterproofing and tile start from clean framing.

Is glass included in every package?

Yes. Refresh and Signature include a clear glass door, and Luxe Spa includes a frameless glass enclosure. Either way the glass is measured after the tile is finished and installed about 1.5 to 2 weeks later so it fits exactly. A sliding door costs a little more on any package.

What kind of waterproofing do you do?

Every shower goes on a Schluter waterproofing system: a foam pan and a bonded membrane under the tile, so water cannot reach the framing. It is the system the tile industry uses for showers meant to last.

Can I get an estimate without a site visit?

Yes. Send a few photos of the room and we reply with a price range. If it looks like a fit, we schedule a visit to measure and firm up the number.

Does the drain have to move for a tub-to-shower conversion?

Not always. A tub drain sits at one end of the alcove, and the new shower drain can often stay close to it. If it does need to move, that plumbing work is the one extra on top of the package price, and it is in your quote before anything starts.

Will taking out the tub hurt resale?

Not if the house keeps one tub somewhere. Buyers with small children want a tub in the house, not in every bathroom. If the tub you are converting is the only one, weigh that before you decide. Most of the tubs we take out were not being used as tubs, and a tiled walk-in shower reads as finished work to a buyer.

Does a tub-to-shower conversion change the layout of the room?

No. The shower takes the tub’s alcove, so the vanity, toilet and door stay where they are. If you want the rest of the room done at the same time, that becomes a full bathroom remodel, and most of those land between $20,000 and $35,000.

All questions and answers

Get an estimate

Start with a few photos

Send photos for a price range

A few photos of the room and a line on what you have in mind. We reply within 24 hours, Monday through Friday.

Up to 5 photos. Phone pictures are fine; they get shrunk before sending.

Or call or text (208) 481-2298.

  • A reply within 24 hours, Monday through Friday
  • A price range, not a sales call
  • No site visit needed for a first number